We brought the RV up on Thursday and set it up on the property so we could use the truck to bring up a trailer load of tools and materials on Friday evening.




We headed up to the property Friday after work and we unloaded the trailer full of materials and tools and set up a work area.




Saturday morning we started on the front wall of the living area.


After battling rain most of the day we were able to frame up the front door opening, the front wall of the living room and install some of the wall sheeting.




Sunday we framed up the rest of the front of the building and sheeted the outside of the walls.




Monday we started the morning with a storm and rain but were able to move the RV into it's new home.



Once the rain quit we installed the window for the front bathroom, the front bedroom windows, the front door and started installing the house wrap and some of the Hardie trim.



We still need to install the living room windows  but his is what it looked like at 2:00 p.m. today when we headed home.