Day Four of the Building Construction.
By noon today they had all the walls, roof and trim complete
Rear of the building with only a couple of the windows in place.
In the future there will be 18 feet of windows and a door off the enclosed porch (left corner) that will look out to a large wood deck.
T
RV bay and shop side of the building. This side will not get any windows
Tall opening is for our RV/shop and the middle opening is for a double car garage.
Far right opening is where the front wall of the living area will be and will have a covered porch.
View from the street just outside the gates.
We will also have a carport over the double garage door.
Continuous metal roof sheets.
All they have left are the two garage doors and then we take over and finish the rest.
By noon today they had all the walls, roof and trim complete
Living area and enclosed porch side of the building. We will eventually have 9 feet of windows in the right corner of this wall.
Rear of the building with only a couple of the windows in place.
In the future there will be 18 feet of windows and a door off the enclosed porch (left corner) that will look out to a large wood deck.
T
RV bay and shop side of the building. This side will not get any windows
Tall opening is for our RV/shop and the middle opening is for a double car garage.
Far right opening is where the front wall of the living area will be and will have a covered porch.
View from the street just outside the gates.
We will also have a carport over the double garage door.
Inside looking back towards where the enclosed porch will be.
Continuous metal roof sheets.
All they have left are the two garage doors and then we take over and finish the rest.