We put up 350 ft of 4x4 wire fence, unfortunately we had to squeeze 100 ft of it between our posts and the neighbors old barbed wire fence.
Front Retaining Wall
Laying out the stone for the retaining walls and planters
Front Elevation
We added the skirting across the front of the covered porch and carport
Started Framing
Front bathroom
Wall between the garage and house
kitchen wall
Installing the Stone
Premier Plaster and Stone starting installing the stone wainscot and wrapping the front porch column bases using 4", 6" and 8" Cream Chopped Stone with buff mortar.
We bought several extra tons of stones so we have enough for the fireplace and some landscape retaining wall along the front and side.
Driveway
They graded the driveway apron and approach, formed the apron and started setting steel.
Used the skid loader to lay out some base for the driveway
Front sidewalk
Blayne and I set the forms for the front walkway and step.