They started excavating for our septic tank. We are having an NuWater Wastewater Aerobic Septic System installed by Paul Swoyer (www.paulswoyerseptics.com).
Monday, March 18, 2013
French Doors
We installed the two sets of french doors, one in the kitchen and one in the master.
More siding
Installed more siding across the front of the living area, we will have stone across the front below the siding and around the bases of the 3 columns that will be installed to support the roof over the front porch.
More lumber
We picked up another load of lumber, this time for the walls between the living area and the garage and shop.
Patio Ceiling
Laying out the ceiling framing for the enclosed patio area.
Back Porch Windows
We put together the framing for the first set of three windows for the enclosed patio area. We will have a total of nine windows when we are done.
The Boat
We brought up our trusty old boat so it could try out it's new home. It should get used more often now that its only five minutes to the water.
Epoxying the garage floor
We epoxied the garage floor and will do the same to the floor were the RV and boat are stored.