Thursday, January 31, 2013

Day Three of the Building Construction.

By the end of the day they will have all the wall sheets and trim up.

















 

Wednesday, January 30, 2013

Metal Building Contractor

I am very impressed with the men from WD Metal Buildings www.wdmb.com . they show up when they say they will, they are very knowledgeable, professional and detail oriented. In just 2 days they have the entire metal frame work in place.




From the Owners to the Workers they are a First Class operation.
Day Two of the Building Construction.

They were able to get quite a bit completed yesterday.



This area will be the enclosed rear porch off of the master bedroom and the kitchen and will have 9 feet of windows on the side and 18 feet of windows along the back wall.  we will have glass french door leading into it from both the master bedroom and the kitchen.



Painting all the welds and bare metal.

Framed openings for the back kitchen windows and the back bedroom.


Back kitchen windows and the back bedroom windows in place.


Just before I took this picture last night the winds picked up and the temperature dropped 10 degrees, looked like we were going to get a storm.  Unfortunately the high winds today prevent hanging any wall panels.
Day One of the Building Construction.

This is what it looked like at 4:30 Monday afternoon. 













Last night when we went back after dark  all the roof purlins were already installed and they had started on the wall purllins for the RV garage and shop.

The Views

The view from the kitchen, the master bedroom and enclosed rear porch.



The Completed Foundation 










The foundation after all the forms have been removed.

Tuesday, January 22, 2013

The Trenches

Lorrie cleaning out the ends of the trenches so we can finish running the electrical conduits now that the foundation is done.