Day Three of the Building Construction.
Thursday, January 31, 2013
Wednesday, January 30, 2013
Metal Building Contractor
I am very impressed with the men from WD Metal Buildings www.wdmb.com . they show up when they say they will, they are very knowledgeable, professional and detail oriented. In just 2 days they have the entire metal frame work in place.
Day Two of the Building Construction.
They were able to get quite a bit completed yesterday.
This area will be the enclosed rear porch off of the master bedroom and the kitchen and will have 9 feet of windows on the side and 18 feet of windows along the back wall. we will have glass french door leading into it from both the master bedroom and the kitchen.
Painting all the welds and bare metal.
Framed openings for the back kitchen windows and the back bedroom.
Back kitchen windows and the back bedroom windows in place.
Just before I took this picture last night the winds picked up and the temperature dropped 10 degrees, looked like we were going to get a storm. Unfortunately the high winds today prevent hanging any wall panels.