Tuesday, April 15, 2014

Tape and Floating

Tape and floaters got started this weekend and it should all be downhill from here 
.
  



Double stacked stilts to reach the 13 ft. ceilings












Sunday, April 13, 2014

Fireplace

We installed the fireplace, sheetrocked the wall and install the mantle frame work this past weekend




Attic decking

Weekend before last we started decking the entire attic space some of which will house the HVAC unit and duct work and some will be storage.