Barndominium
Building a Barndominium
Saturday, May 31, 2014
Driveway
Fireplace
Electrical Trim Out
Paint
Tuesday, April 15, 2014
Tape and Floating
Tape and floaters got started this weekend and it should all be downhill from here
.
Double stacked stilts to reach the 13 ft. ceilings
Sunday, April 13, 2014
Fireplace
We installed the fireplace, sheetrocked the wall and install the mantle frame work this past weekend
Attic decking
Weekend before last we started decking the entire attic space some of which will house the HVAC unit and duct work and some will be storage.
Older Posts
Home
Subscribe to:
Posts (Atom)